VIAL CAPPING TEST BENCH
New high-speed assembly process concepts must be validated on stations that simulate the final conditions. This is a GO/NOGO step before the start of the manufacturing phase of the final production equipment.
Date
JUN 2004
Status
DESIGN DELIVERED
Category
LIFE SCIENCES
Client
ASEPTIC TECH